CASE STUDY
Blackrock ConstructionTechnology Keeping Large-Scale Concrete Work Moving in the Heart of Chicago
Downtown Chicago sets the pace. Tight streets, limited access, and constant activity shape every build in the city.
At Bally’s Casino, ConcreteIL contractor, BlackRock Construction is delivering layout, formwork, and all concrete placement and finishing for foundations, slabs, and decks in partnership with general contractor Gilbane. Projects like this reflect how ConcreteIL contractors operate across Chicagoland, where technology and field execution must stay tightly connected.
At Bally’s Casino, those conditions carry directly onto the jobsite. Multiple trades work in close coordination, space is limited, and sequencing is constant.
Built for scale and complexity
“The scale of Bally’s project is literally huge. It’s probably a couple of football fields right here in the heart of the city. It is a lot of stuff going on in a very tight place.”
– Chad CZERWINSKI
Blackrock Construction
THE FIELD RUNS ON REAL-TIME INFORMATION
BlackRock uses a combination of digital tools to support coordination and planning on site.
BIM software is used to bring clarity to the work and support coordination during planning. Bluebeam Revu is used for field coordination and digital plan management. Digital scheduling tools are used to track pour sequences and coordinate logistics across active areas.
The team also uses real-time concrete monitoring to support work in the field.
Crews rely on mobile access to RFIs, drawings, and project updates so current information is available on site.
“Technology has played a huge role in not just this project but all of ours. It’s allowed us to bring the office to the field.”
That connection changes how work gets done. Instead of waiting on information or chasing updates across different systems, crews stay aligned with the same live data in real time.
Fewer errors, faster decisions
Union Craftsmanship Behind The Technology